Projects  /  Water & Wastewater Systems

Al-Maabda Al-Sharqiya Wastewater Project

Assiut, Egypt Completed
Al-Maabda Al-Sharqiya Wastewater Project
Capacity / Metric 6.685 km Gravity Network + 1.4 km Force Main
Sector Water & Wastewater Systems
Location Assiut, Egypt
Client National Organization for Potable Water and Sanitary Drainage (NOPWASD)

01. PROJECT OVERVIEW

Architectural Concept & Delivery Scope

Comprehensive sanitation upgrade scheme serving the Abnoub and El-Fath districts in Assiut Governorate. Al Bahaa Construction executed 6.685 km of UPVC/GRP gravity collector sewers, built a deep wet-well wastewater pumping station, and laid a 1.4 km ductile iron force main to transfer collected sewage to the regional treatment plant.

02. ENGINEERING HIGHLIGHTS

Key Technical Disciplines & Innovations

  • 6.685 km of gravity collection sewer networks with manhole connections.
  • Deep reinforced concrete submersible pumping station with standby power generation.
  • 1.4 km pressure force main conveying effluent across district boundaries.
  • Significantly improved public health and groundwater protection in Eastern Maabda.