Projects  /  Strategic Pipelines & Intakes

Al-Husseiniya Wastewater Project

Fayoum, Egypt Completed
Al-Husseiniya Wastewater Project
Capacity / Metric Complete HDPE Force Mains Network (Hayah Karima)
Sector Strategic Pipelines & Intakes
Location Fayoum, Egypt
Client National Organization for Potable Water and Sanitary Drainage (NOPWASD)

01. PROJECT OVERVIEW

Architectural Concept & Delivery Scope

Executed under the auspices of the presidential Decent Life (Hayah Karima) initiative in Fayoum Governorate. The project engineered and installed a continuous butt-fused HDPE wastewater force main network equipped with automated control chambers, isolation gate valves, and air release stations.

02. ENGINEERING HIGHLIGHTS

Key Technical Disciplines & Innovations

  • Complete High-Density Polyethylene (HDPE) butt-fusion welded force main.
  • Specialized control, washout, and air release maintenance chambers.
  • Presidential Decent Life (Hayah Karima) national infrastructure delivery.
  • Long-term environmental protection and sustainable sanitation services.